Telephone 07502 392 882
Case Study
Case Study
SpeeTile10 with tubing laid on a solid concrete floor before the self-leveling screed is poured on.
WARP Office, Self-leveling mortar has just been poured and is setting!
SpeeTile10 with tubing laid on a solid concrete floor in a lovely cottage. 75mm tube spacing
SpeeTile12 with tubing installed onto a main wall of an office building under construction. 100mm tube spacing
SpeeTile10 with tubing laid on a solid concrete floor with the SpeeTop self-leveling mortar being poured. 75mm tube spacing
SpeeTile10 with tubing laid on a solid concrete floor prior to self-leveling mortar being poured. 75mm tube spacing
SpeeTile10 with tubing laid on a solid concrete floor prior to self-leveling mortar being poured.
SpeeTile10 being covered with SpeeTop self-leveling mortar giving a shiny levelled finish.
SpeeTherm15 completed in a kitchen. SpeeTherm totally covered by our 10-50 conductivity heat spreading aluminum for extra heat saving more of your energy!
SpeeTherm15. Our SpeeTherm is totally covered by our 10-50 conductivity heat spreading aluminum with 100mm tubing centers for extraordinary coverage.
SpeeTile10 & SpeeTherm15 laid on the same floor using the same manifold.
Solid floor before SpeeTile10 tiles and tubes. After the system is laid & finally with self leveling mortar. The total build is 15mm.
SpeeTile10 with tubing laid on a solid concrete floor prior to self-leveling mortar being poured. 75mm tube spacing.
SpeeTile10 with tubing laid on a solid concrete floor prior to self-leveling mortar being poured. 75mm tube spacing.
Homebuilding & Renovating show Birmingham 2024
London Build Expo London 2024
07502 392 882
info@ducoheating.com